Resources
Back to Homepage
   
 
Airedale Corridors Economic Summary (84KB)

Airedale Corridors Economic Summary (84KB)


Airedale Partnership Project Case Studies (2.9MB)

Airedale Partnership Update Report 2011 (3.1MB)


Report: Connecting the Leeds City Region to its urban/rural fringes (1.7MB)

Report: Connecting the Leeds City Region to its urban/rural fringes (1.7MB)


Airedale Corridors Economic Summary (84KB)

Dalton Lane Green Business Park Programme - Case Studies


65KB


  Part 1 - Introduction and Background (Pages 1-5)
  Part 2 - A Highways and Landscape Design Feasibility Study (Pages 6-8)
  Part 2 - 1.0 Introduction (Pages 9-11)
  Part 2 - 2.0 Landscape Design Statement (Pages 12-15)
Part 2 - 3.0 Keighley Route Section (Pages 16-41)
Part 2 - 4.0 Bingley Route Section (Pages 42-51)
Part 2 - 5.0 Healey Lane Section (Pages 52-67)
Part 2 - 7.0 Summary of Estimated Highways Costs (Pages 79-80)
Part 3 - A segregated cycle and pedestrian route from Bingley Fire station to Crossflatts (Pages 80-89)


2.64MB

89KB

74KB

205KB

275KB

104KB

N.B. The above documents were created using Adobe Acrobat Version 6.0. If you do not have the Adobe Acrobat Reader (freeware) or have a version lower than 6.0 please click on the button below to download/upgrade.

Get Adobe Reader

Back

   
AIREDALE NEWS

09 September 2014 -
Move to new premises will allow Keighley firm to `grow and grow`

[full story]

27 August 2014 -
Bingley Music Live

[full story]

UPCOMING EVENTS

There are currently no future events to view

AIREDALE GREENWAY
Click here to download the Airedale Greenway map
E-BULLETIN
Click here and provide your name, if you would like to receive the Airedale Partnership e-bulletin.
Spring 2011 e-bulletin Spring 2012 (244KB)
Spring 2011 e-bulletin Autumn 2011 (484KB)
Spring 2011 e-bulletin Spring 2011 (273KB)
e-Bulletin Archive
 
   
 
Home Contact Us Links Site Map